P&ID and PFD in the Document Control Flow

"Any change in the "PID" impacts your document control process" was the first mention I heard about the P&ID. From the information manager's side of the box, it could have been either a Plan Identifier or a Project Initiation Document, but obviously both were out of scope. Trying to sort this out, I eventually found a few useful resources explaining what a Piping & Instrumentation Diagram was and what it was used for.


To understand the links between the P&ID and his twin, the Process Flow Diagram (PFD) :

  • A detailed presentation from the engineer point of view, here, another about the main differences between P&ID and PFD, here

  • Multilingual (European) pages about P&IDs : this page lists the Oil & Gas instrument abbreviations, and this one provides an overview of the P&ID design and how to read it (tag numbers, loop identification, ...). 

  • See here the drawing symbols for P&ID, Isometric drawings and piping arrangement

  • To translate and understand the basic designs I usually refer to the Wikipedia pages, in English or french, or to universities websites such as the ETS canadian website.

Document Control processes, P&ID standards and software specifications

  • This presentation of a P&ID also introduces to basic line and instrument symbols

  • Useful checklists for P&IDs review and engineering packages review, here.

Compliance and control sheets : ISA and ISO standards :

ISA series
  • ANSI/ISA-5.1-2009 : Identification, Symbols and instrumentation

  • ISA-5.2-1976 (R1992) : Binary Logic Diagrams for Process Operations

  • ISA-5.3-1983 : Graphic Symbols for Distributed Control / Shared Display Instrumentation, Logic and Computer Systems

  • ANSI/ISA-5.4:1991 : Instrument Loop Diagrams

  • ISA-5.5:1995 : Graphic Symbols for Process Displays

  • Standard : ANSI/ISA-5.06.01-2007 : Functional Requirements documentation for Control Software Application

ISA data sheets :
  • ISA-20.00.03-2001 : Specification Forms for Process, Measurement and Control Instruments, Part 3, Form Requirements and Development Guidelines

  • ISA-TR20.00.01-2007 : Specification Forms for Process Measurement and Control Instruments, Part 1, General considerations

Former data sheets and the previous ISA standard (ISA-S20:1981 : Specification Forms for Process Measurement and Control Instruments, Primary Elements, and Control Valves)

Associated ISO series
  • ISO 14617-1:2005(R2010) : Graphical symbols for diagrams -- Part 1: General information and indexes

  • ISO 14617-1:2005 : Part 2-Part 17

  • And associated standards ICS 01.080.30

Management of process hazard :
  • OSHA : chemicals

  • API RP 750 : petroleum, offshore facilities

Former instrumentation standard if you deal with the archives :
  • SAMA

Document control software :

By designing links between the P&ID, the PFD and the Master Document Register inputs in the Enterprise Content Management System, you may secure your document control process and tame the changes in revision.
Research : Thomas Heer. Controlling Developement Processes. A Windows Workflow Foundation based framework for dynamic workflows and a testing review for .NET applications




dimanche 13 juillet 2014

Final Report

The Final Documentation on Oil & Gas projects can achieve an overall volume of 200.000 documents. Looking for specifications in this field I found tips from Document Control professionals, which may sound familiar as they apply to many complex projects. Here is a summary from the Contractor's point of view.
Synthesis

  1. Send a checklist to vendors and subcontractors, prior to close-out documentation issues

  2. If vendor/subcontractor documents are missing, work with the project control department before they pay the bill, in order to obtain the missing sheets (even better if you have had this specified from the purchase order, so the documentation delivers the bill)

  3. Prepare your own final report for contract completion according to mandatory requirements, project handover checklist & issued SOW

  4. As-built integration - possible procedures:
    • As-built is integrated in the EDMS the same way a normal document regarding the changes in revision, but the control procedures are changed to “As-built Documentation” : As-built are uploaded as single documents, composing a package. The handover report will contain the latest revision of the consolidated As-built documentation

    • As-built is treated like a single package, so make sure your As-built drawings have been recorded as the latest revision of the original drawings, especially if you have not registered them as individual documents superseding the previous ones. Associate the changes & comments to the final report as linked documentation.

  5. Things to keep in mind:

    • In most cases, As-built drawings & maintenance manuals are to be supplied by the contractor in both hard copy and electronic formats. ISO 15489 and ISO 82045 might help here.

    • Warranties should be complete

    • All documentation composing the final report may be tracked in the EDMS, including :

      • Documents authorization

      • Revision history
        • Final validation and signatures

        • Consolidated commentaries

        • Workflow history (review and versioning references)

      • Related business processes